Skip to page body Home About GP City Government Residents Business Visitors I Want To...
Want to receive the latest construction updates on a weekly basis? Sign up for our E-newsletter here.
News
Traffic Signal Upgrades at 100 Street and 98 Avenue Begin on Thursday, November 29
Upgrades at 100 Street and 98 Avenue begin on November 29 with the installation of temporary traffic signals.
Posted Date: 11/27/2018
Residents Invited to Open House for 104 Avenue Upgrades
Residents are invited to an open house regarding upgrades to 104 Avenue between 92 Street and 88 Street on November 21, 2018, between 4 p.m. and 7 p.m. at I.V. Macklin School in the Lecture Theatre.
Posted Date: 11/19/2018
116 Avenue and 100 Street Intersection to be Temporarily Placed into Flashing Mode on November 11
On Sunday, November 11, drivers should expect to treat the intersection of 116 Avenue and 100 Street as a four-way stop.
Posted Date: 11/9/2018
One Day Lane Closure on 100 Street Between 99 Avenue and 101 Avenue
Drivers will experience alternating lane closures on 100 Street between 99 Avenue and 101 Avenue on Friday, November 9, 2018.
Posted Date: 11/8/2018
Temporary Traffic Signals on 102 Avenue to be Removed This Weekend
The temporary traffic signals at the intersections of 102 Avenue/102 Street (Muskoseepi Park Entrance), and 102 Avenue/100 Street (Downtown Tim Hortons) will be removed over Friday, November 1 and Saturday, November 2.
Posted Date: 11/1/2018
100 Avenue Confirmed to Open to Traffic by October 29
100 Avenue between 100 Street and 102 Street is confirmed to open to vehicle traffic and parking by Monday, October 29. Transit Routes 2 and 4 will also return to their regular routes on this day.
Posted Date: 10/25/2018
Road Improvements Begin Wednesday, Result in Transit Detour
108 Avenue East of 98 Street Closed to All Traffic, Results in Transit Route 1, 3 and St. Joes AM Detour
Posted Date: 10/16/2018
Bridge Repair and Maintenance Program Begins
Starting Tuesday, October 9 maintenance work is taking place on several vehicular and pedestrian bridges in Muskoseepi Park along the Bear Creek Trail system and the bridge on 132 Avenue east of 116 Street.
Posted Date: 10/5/2018
Shoreline and Underwater Surveys on Bear Creek Reservoir Scheduled for October
Bathymetric surveying and mapping is scheduled to begin on Wednesday, October 3, 2018 and continue for the rest of the month within the Bear Creek Reservoir.
Posted Date: 10/2/2018
Temporary Partial Trail Closure for Woody Channel Slope Repair
Repairs on the west bank of Woody Channel near 70 Avenue and 85 Street in Signature Falls begin on October 1st, 2018.
Posted Date: 10/1/2018
Ivy Lake Trail Partially Detoured due to Repairs
Repairs on the southeast bank of Ivy Lake begin on September 25, 2018 and are expected to be complete early October.
Posted Date: 9/25/2018
Resources Road and 84 Avenue to Receive Traffic Light Improvements
Beginning Monday, September 24, motorists may experience minor traffic disruptions at the intersection of 84 Avenue and Resources Road.
Posted Date: 9/21/2018
Aquatera Installs Sanitary Force Main on 108 Street and 132 Avenue
Aquatera Utilities Inc. will be installing a sanitary force main along 132 Avenue and 108 Street.
Posted Date: 9/21/2018