2018 Sidewalk Rehabilitation Program

About the Project: 2018 Sidewalk Rehab. Map 1

The annual Sidewalk Rehabilitation Program replaces sidewalks that are in very poor condition on a block by block basis. Selections of candidate sites are based on the City’s evaluation and rating criteria.  

2018 Sidewalk Rehabilitation Program Locations:

 

  • 117 Ave. (Crystal Ridge Rd. to 98 St. - North)
  • 98 St. (117 Ave. to 118 Ave. - West)
  • 118 Ave. (Crystal Ridge Rd. to 98 St. - South)
  • Crystal Ridge Rd. (117 Ave. to 119 Ave. - East)
  • Crystal Ridge Rd. (119 Ave. to 119A Ave. - East)
  • 96 St. (96 St. to 120 Ave. - North and West)
  • 119 Ave. (96 St. to 95 St. - North)
  • 95 St. (117 Ave. to 119 Ave. - East)
  • 117 Ave. (96 St. to 94A St. - South)
  • 94A St. (117 Ave. to 119 Ave. - East)
  • 119 Ave. (94A St. to Lakeland Dr. (South)
  • 94A St. (Lakeland Dr. to 120 St. - North and East)
  • 120 Ave. (94A St. to 95 St. - North)
  • 95 St. (120 Ave. to 121 Ave. - North and South)
  • 121 Ave. (Lakeland Dr. to 95 St. - South)
  • 121 Ave. (Lakeland Dr. to 94A St. - North)
  • 121 Ave. (95A St. to Crystal Ridge Rd. - North)
  • 95B St. cul-de-sac (North of 121 Ave.)
  • Crystal Ridge Rd. (121 Ave. to 123 Ave. - East) 2018 Sidewalk Rehab. Map 2
  • 123 Ave. (Lakeland Dr. to Crystal Ridge Rd. - South)
  • 90 Ave. (101 St. to 100 St. - South)
  • 100 St. service road (84 Ave. to 88 Ave. - East)
  • 85 Ave. (99B St. to 100 St. - North and South)
  • 79 Ave. (Mission Heights Dr. to 103 St. - East)  
  • 103 St. (78 Ave. to 79 Ave. - North)
  • 115 St. (97 Ave. to 100 Ave. - East)
  • 97 Ave. (108 St. to 107 St. - South)
  • 117 Ave. (105 St. to 102 St. - South)
  • 102 St. (117 Ave. to 121 Ave. - West) 

Budget:

The 2018 budget for the Sidewalk and Pathway Rehabilitation Program is $2,750,000.00. Funding supplied by: Municipal Sustainability Initiative Grant, Gas Tax Fund and Capital Tax.

Construction Includes:

  • Replace and upgrade a significant portion of concrete sidewalk and asphalt pathways
  • Engineering consultants are utilized to survey, design and supervise construction of sidewalk sections and pathways.
  • Catch basin and manhole repairs or replacements where necessary

Timeline:

The construction schedule is planned for June to September, 2018.

Contact Information: 2018 Sidewalk Rehab. Map 3

 

The engineering contract was awarded to Helix Engineering, 202-10514 67 Ave, Grande Prairie AB T8W 0K8.

The construction contract was awarded to Proform Concrete Services Inc., #201 5301 - 43 Street, Red Deer, AB. T4N 1C8.

The City of Grande Prairie's Engineering Services project contact: Andrew Booth, 780-876-500, abooth@cityofgp.com