About the Project:

Road Rehab is one of Engineering Services annual projects. The City uses the Road Rehabilitation and Overlay programs to increase the life cycle of current roads. Road priorities are set based on the results of the assessment process.

Budget:

The approved budget for this project is $8,000,000.00. Funding supplied by: Municipal Sustainability Initiative Grant, and Capital Tax.

Timeline:Patterson Overlay 2011

The construction schedule is from June to October, 2017.

Rehabilitation and Overlay General Scope: 

  • Asphalt restoration
  • Major road reconstruction 
  • Major manhole and storm system repairs
  • Paving
  • Milling - old pavement surface is removed and new asphalt is applied
  • Minor concrete repairs
  • Minor manhole and storm system repairs

2017 Road Rehabilitation & Locations:
Phase 1:

Phase 2:

  • 116 Street from 97 Avenue to north of 95 Street
  • 84 Avenue (Eastbound Lanes) from 113 Street to 108 Street
  • 98A Street & 98 Street from 84 Avenue to 88 Avenue

Phase 3:

  • 108 Street from Hwy 43 (116 Avenue) to Royal Oaks Drive
  • 117 Avenue from 105 Street to 108 Street
  • 72 Avenue 7 73 Avenue from 106 Street to 107A Street and 107A Street from 72 Avenue to 73 Avenue

Phase 4:

  • 100 Avenue from 105 Street to 108 Street
  • 81 Avenue from 106 Street to 107 Street, 106A Street from 81 Avenue to 82 Avenue and 82 Avenue from 106 Street to 106A Street

Contact Information:

The Engineering Services contract was awarded to Beairsto and Associates Engineering Ltd. at 101 10940-92 Ave., Grande Prairie, AB. T8V 6B5, 780-532-4919

The construction contracts:

  • Phase 1: Contract has been awarded to Wapiti Gravel Suppliers, Box 608, Grande Prairie, AB, T8V 3A8.
  • Phase 2: Contract has been awarded to Knelsen Sand & Gravel Ltd., 9801-156 Ave, Box 21119, Grande Prairie, AB., T8V 6W7.
  • Phase 3: Contract has been awarded to Knelsen Sand & Gravel Ltd., 9801-156 Ave, Box 21119, Grande Prairie, AB., T8V 6W7.
  • Phase 4: Contract has been awarded to Wapiti Gravel Suppliers, Box 608, Grande Prairie, AB, T8V 3A8.

The City of Grande Prairie's Engineering Services project contact: Mark Hoseasson (780) 830-7447, mhoseasson@cityofgp.com 

102 St. Geometric Upgrades

About the Project: 102 Street Upgrades

The basis for this project comes from the 102 St. Traffic Study which was adopted in 2014. This study reviled the congestion at the intersection of 102 St. and 117 Ave. While many solutions were discussed, it has been decided that the best option to allow the road to handle the current and future traffic volumes is to implement concrete medians to aid in traffic flow. These medians are to be placed to allow the intersection to follow a right-in right-out model once construction is completed. This solution allows for higher current traffic volumes and addresses any current safety concerns.

Budget:
The approved 2017 budget for the 102 St. Geometric Upgrades is $400,000. Funding supplied by: Municipal Sustainability Initiative Grant, and Capital Tax.

Timeline:

The construction schedule is from June - October, 2017.

Contact Information:

The Engineering Services contract was awarded to Beairsto and Associates Engineering Ltd. at 101 10940-92 Ave., Grande Prairie, AB. T8V 6B5, 780-532-4919.

The construction contract has yet to be awarded.

The City of Grande Prairie's Engineering Services project contact: Mark Hoseasson, 780-830-7447, mhoseasson@cityofgp.com

Traffic Signals at 105 St. and 116 Ave.

About the Project:

This project allows traffic signals to be implemented at 105 St. and 117 Ave. These lights correspond with the upgraded 102 Street intersection to help aid in the traffic congestion issues that were exposed in the 102 St. Traffic Study.

Budget:

The approved 2017 budget for the Traffic Signals at 105 St. and 116 Ave. project is $500,000. Funding is supplied by: Municipal Sustainability Initiative Grant, and Capital Tax.

Contact Information:

The Engineering Services contract was awarded to Beairsto and Associates Engineering Ltd. at 101 10940-92 Ave., Grande Prairie, AB. T8V 6B5, 780-532-4919.

The construction contract has yet to be awarded.

The City of Grande Prairie's Engineering Services project contact: Mark Hoseasson, 780-830-7447, mhoseasson@cityofgp.com 

Downtown Rehabilitation and Streetscape Upgrades:

About the Project:

The Downtown Rehabilitation and Streetscape Upgrades are to address aging infrastructure within the downtown core, both below and above ground, and to create a more attractive downtown in the process. The work is divided into four separate phases:  Beginning of Work

Phase 1: 101 Street from 98 Avenue to north of 102 Street 

Phase 2: 101 Avenue between 1the Golden Age Centre to 100 Street

Phase 3: 100 Avenue between 102 Street to 100 Street

Phase 4: 100 Avenue between 100 Street to 98 Street

For more information about this project, please visit: www.cityofgp.com/ourdowntown

Budget:

The City has received $20,000,000.00 in Municipal Sustainability Initiative (MSI) funding for the Downtown Rehabilitation and Streetscape Upgrades project.

General Scope of Work:

  • Deep utilities (sanitary, storm and water)
  • Urban roadways (shallow utilities, sidewalks and walkways, curb and gutter and roads)
  • Streetscape elements (planting, furniture, street lights and other special features)

Timeline: Materials

  • Phase 1: Design - 2015/16, Construction - 2016
  • Phase 2: Design - 2015/16, Construction - 2017
  • Phase 3: Design - Planned for 2017, Construction - Planned for 2018
  • Phase 4: Design - Planned for 2018, Construction - Planned for 2019

Contact Information:

The Engineering Services contract, for Phases 1 and 2, was awarded to ISL Engineering and Land Services Ltd. Suite 100, 7909-51 Ave. NW Edmonton, AB. T6E 5L9

The construction contract for Phases 1 and 2 was awarded to Wapiti Gravel Suppliers, Box 608, Grande Prairie, AB, T8V 3A8

The Engineering Services and construction contracts for Phases 3 and 4 have yet to be awarded.

The City of Grande Prairie's Engineering Services project contact: Conor Coney, 780-538-0361, cconey@cityofgp.com.

116 St. Asphalt Overlay and Culvert Bridge Replacement:

About the Project:

The primary objective of this project is to extend the service life of the road by laying a new asphalt overlay and replacing an old bridge-sized culvert with a new, larger bridge culvert. These upgrades are intended to handle current and future traffic and water volumes. The construction takes place along the 116 Street between 68 Avenue South and City Limit.

Budget:

The approved 2017 budget for the 116 St. Asphalt Overlay and Culvert Bridge Replacement is $955,000.00.

Timeline:

This project is anticipated to begin in August and to be completed by October 2017.

Contact Information:

The Engineering Services contract was awarded to Allnorth, 10530 117 Ave., Grande Prairie AB., T8V 7N7

The construction contract has yet to be awarded.
The City of Grande Prairie's Engineering Services project contact: Daniel Dawson, 780-538-0306, ddawson@cityofgp.com

68 Avenue Twinning:

About the Project:

This project is for the design of a four lane divided arterial roadway from 108 St to Poplar Dr. The work also includes a new traffic bridge over Bear Creek. For more detailed information please see our 68 Ave. project specific page.

68 Avenue Concept Drawings (PDF, 5992KB)

Budget:

The approved 2016 budget for the 68 Avenue Twinning project is $10,750,000.00 and it comes from Transportation System Levy Reserve, the Municipal Sustainability Initiative Grant and General Debenture. Funding is broken down as follows:

68 Avenue Twinning and Bridge Design 68 Ave Bridge

  • 2015: $750,000.00

Bridge Construction

  • 2015/16: $4,000,000.00

Road Twinning/Construction

  • 2016: $6,000,000.00

Timeline:

The construction schedule is from May - October, 2016.

Contact Information:

The Engineering Services contract was awarded to Beairsto and Associates Engineering Ltd. at 101 10940-92 Ave., Grande Prairie, AB. T8V 6B5, 780-532-4919.

The road construction contract was awarded to Knelsen Sand & Gravel Ltd., 9801-156 Ave, Box 21119, Grande Prairie, AB., T8V 6W7 and the bridge construction contract was awarded to Eiffage Innovative Canada Inc.

The City of Grande Prairie's Engineering Services project contact: Daniel Dawson, 780-780-538-0306, ddawson@cityofgp.com

Road Rehabilitation and Apron at Fire Halls:

About the Project:

This project is to replace the current concrete pads leading in and out of the fire hall bays and the surrounding road and parking lot. Over time the concrete pads and asphalt deteriorate and this year they will receive a complete rehabilitation. This project has been divided into two phases.

Phase 1 includes replacing the concrete pads located at the entrances to the west and fire hall bays.

Phase 1 was awarded to

Phase 2 includes replacing the asphalt road and parking lot surrounding the business.

Budget:

The approved 2016 budget for the Road Rehabilitation and Apron is $689,950.00. Funding is supplied by the Municipal Sustainability Initiative Grant.

Timeline:

The work is expected to be completed by the end of this construction season.

Contact Information:

The City of Grande Prairie's Engineering Services will complete the engineering work in house.

The construction contract has yet to be awarded.

The City of Grande Prairie's Engineering Services project contact: Andrew Booth, 780-830-5004, abooth@cityofgp.com

2017 Thermoplastics Program

About the Project:

The Thermoplastics Program helps to prolong the life of the City’s pavement markings. The Thermoplastic product is used in substitution of regular paint and is considered to be much more durable. Applying this product includes grinding off a top layer of asphalt and filling it with the thermoplastic product.The City will be applying this product to the following areas this year:

  • 104 Avenue and 115 Street
  • 100 Street from 85 Avenue to 75 Avenue
  • 84 Avenue from 100 Street to Resources Road
  • 116 Street from 84 Avenue to 97 Avenue
  • 68 Avenue and Pinnacle Street
  • Resources Road and 68 Avenue
  • Resources Road and 97 Avenue
  • Resources Road from 97 Avenue to 88 Avenue
  • 100 Avenue and 94 Street
  • 104 Avenue and 110 Street
  • 117 Avenue and 108 Street
  • 101 Avenue and 92 Street
  • Pinnacle Boulevard and Ecole Nouvelle Frontiere
  • 104 Avenue
  • 68 Avenue and 88A Street
  • 74 Avenue and 104A Street
  • Royal Oaks Drive and 105 Street
  • Royal Oaks Drive and 104A Street
  • 104 Avenue and 116 Street
  • 116 Street near 101 Avenue
  • 100 Avenue and 100 Street
  • 107 Avenue between 110 Street and 108 Street

Budget:

The contract was awarded for $183,660.00, exclusive of GST.

Timeline:

This project is expected to be completed by the end of the 2017 construction season.

Contact Information:

The construction contract has been awarded to AAA Striping & Seal Coating Service, 9519 - 42 Avenue NW, Edmonton, AB. 780-435-2214.

The City of Grande Prairie's Engineering Services project contact: Andrew Booth, 780-830-5004, abooth@cityofgp.com

Last updated: 9/21/2017 3:45:34 PM