2017 Phase 1 and 2 Construction Schedule

The map below indicates time-frames for each stage of underground work. An exact schedule for surface work is to be determined.

All schedules are tentative and subject to change.

 

2017 Staging Map

Project Phasing

Phase 1- Adjacent to Revolution Place on 101 St. north to 102 Ave. (2016/2017)

Phase 2- 101 Ave. from the Golden Age Centre to 100 St. (2017)

Phase 3- 100 Ave. from 102 St. to 100 St. (TBD)

Phase 4- 100 Ave. from 100 St. to 98 St. (TBD)