Skip to page body Home About GP City Government Residents Business Visitors I Want To...

Construction on the re-designed Muskoseepi Park Senior Children’s Playground officially begins on July 3. 

Scope of Work

  • July 3 to July 9: Removals of old playground equipment, playground sand and concrete curbing
  • July 16 to August 17: Excavation of base and subgrade preparations and construction of new concrete retaining wall and concrete playground border
  • August 20 to August 31: Installation of new playground structure
  • September 1 to September 21:  Installation of rubber surfacingPlayground Design 2018

Features 

  • Designed to accommodate up to 50 children aged 5-12
  • 620 square meters 
  • 40+ distinct play features/events
  • 10 accessible/inclusive play features (6 ground level, 4 elevated)
  • 3-bay swing set with 6 belt swing seats
  • Rubberised tile surfacing .

A 3D rendering will be on display within the Ernie Radbourne Pavilion or can be downloaded online.

Temporarily Closures

The playground will be closed to the public with construction fencing from July 3- September 30 to allow for the work to be completed. 

The Junior Playground and spray pad will remain open during the construction process.

We thank everyone for their patience and understanding, and hope to see everyone in October for the grande re-opening!

Last updated: 7/3/2018 10:45:11 AM