The work is comprised of approximately:

  • 100 Street at 82 Avenue:
    • Supply and install new power distribution cabinet complete with conduit and wiring.
    • Remove and dispose of the existing power pedestal.
    • Supply and install conduit and vault for future City fibre.
  • 108 Street at 76 Avenue:
    • Supply and install new power distribution cabinet and traffic controller cabinet complete with conduit and wiring.
    • Remove and dispose of the existing cabinets.
    • Supply and install conduit and vault for future City fibre.
  • 108 Street at 84 Avenue:
    • Supply and install new power distribution cabinet and traffic controller cabinet complete with conduit and wiring.
    • Remove and dispose of the existing cabinets.
    • Supply and install conduit and vault for future City fibre.
  • 100 Street at 94 Avenue:
    • Supply and install complete new set of traffic signals including all above ground and below ground infrastructure.
    • Remove and dispose of existing traffic signal infrastructure.
    • Supply and install conduit and vault for future City fibre.

Addenda 1-answer written questions (see Alberta Purchasing Connection for full document)
Addenda 2-extend closing date (see Alberta Purchasing Connection for full document)