• 768 m2 of Asphaltic Concrete Pavement Removals (Various Depths)
  • 780 m3 of Waste Removals
  • 1,783 L.m. of Concrete Structure Removals (All types)
  • 40,111 m2 Cold Mill Asphalt Surface
  • 34 ea. - Storm Manhole/Catch Basin Repairs (Type 1)
  • 26.3 V.m Install New CBMH, CB, MH (Type 4 Various Depth)
  • 1783 L.m. of Concrete Structure Installation (All types)
  • 8,560 t of Asphaltic Concrete Pavement Installation (Various depths and lifts)
  • 4,674 L.m of Line Painting (Various type and colour)
  • 1,287 m2 of Landscaping